- Building 165
Building 165
Permanent URI for this collection
67 results
Filters
Reset filtersSettings
Statistics
Citations
Search Results
Now showing
1 - 10 of 67
-
No Preview AvailableItemBuilding 165, Chemical Engineering #1: L2 Office Alterations -plan,details & Refl. Ceiling. Plan(1999)Architectural Drawing
-
No Preview Available
-
No Preview AvailableItemBuilding 165, Chemical Engineering #1: Chemical Engineering, Theatre A, Build Work A/v Installation(1993)Architectural Drawing
-
No Preview AvailableItemBuilding 165, Chemical Engineering #1: Chemical Engineering, Proposed Plans & Elevations(1993)Architectural Drawing
-
No Preview AvailableItemBuilding 165, Chemical Engineering #1: Chemical Engineering - Proposed Solvent Store(1992)Architectural Drawing
-
No Preview Available
-
No Preview Available
-
No Preview AvailableItem
-
No Preview AvailableItemBuilding 165, Chemical Engineering #1: Existing Conditions/Demolition Plan/Site Plan(2006)Architectural Drawing
-
No Preview AvailableItemBuilding 165, Chemical Engineering #1: Level 3 - Reflected Ceiling Plan(2004)Architectural Drawing